YVS Performance 5SGTE
Moderators: IMOC Moderators, IMOC Committee Members
-
- Posts: 3781
- Joined: Fri May 28, 2010 12:04 pm
- Location: London, Edinburgh, or the Highlands!
Re: 5S - Second engine rebuild required already!!!
The guys at stainless creations (Falkirk) did the same thin with their boot lid. Is yours strong? Do you remove the webbing?
Re: 5S - Second engine rebuild required already!!!
It was Graydon (Stainless Creations) that done the BMIC, exhaust, heat-shield, cage install and boot lid. Top work and good value for money.
My boot lid was based on theirs.
Some webbing removed and it is strong!
Will get photos of underside tomorrow.
My boot lid was based on theirs.
Some webbing removed and it is strong!
Will get photos of underside tomorrow.
Re: 5S - Second engine rebuild required already!!!
Just had a read of the whole tread top work ,
Which turbo are you running a stock ct20b ?
Can you tell much difference in spool time /lag with the boot mount over side mount cooler ?
Which turbo are you running a stock ct20b ?
Can you tell much difference in spool time /lag with the boot mount over side mount cooler ?
My TRD WIDEBODY build thread http://www.imoc.co.uk/forums/viewtopic.php?t=164957
Re: 5S - Second engine rebuild required already!!!
Thanks mate. It's come a long way since day 1... Never thought I'd take a jig-saw to my dash when I first bought the car... Oh well
Stock turbo (at the moment!). I haven't driven the car since the addition of the BMIC was made. Should be good! Need to get it on the dyno to get the boost reset and see what power it's making now. Previously made 258rwhp. Would like to think it'll be somewhere around 10rwhp more (based on others cars I have encountered with same mods.
Track night on the 20th. 2 hour open pit which is perfect since I've not been out in it in over a year!
The engine will let go at some point so when it does I need to think about what's next for it, but I already know!
Stock turbo (at the moment!). I haven't driven the car since the addition of the BMIC was made. Should be good! Need to get it on the dyno to get the boost reset and see what power it's making now. Previously made 258rwhp. Would like to think it'll be somewhere around 10rwhp more (based on others cars I have encountered with same mods.
Track night on the 20th. 2 hour open pit which is perfect since I've not been out in it in over a year!
The engine will let go at some point so when it does I need to think about what's next for it, but I already know!
Re: 5S - Second engine rebuild required already!!!
Looks awesome
Re: 5S - Second engine rebuild required already!!!
Been reading this thread since I joined up, car looks spot on mate, looking forward to seeing it on track!
Re: 5S - Second engine rebuild required already!!!
Thanks mate.
Re: 5S - Second engine rebuild required already!!!
Car will be finished this week and back on the road.
First track day on the 16th.
First track day on the 16th.
Re: 5S - Second engine rebuild required already!!!
WOW this is flying along mate great work, id be up for popping along to a track with you and Ash one day
Re: 5S - Second engine rebuild required already!!!
Good work buddy- you're gonna love it
And a big YES to a combined trackday- sounds like a fantastic idea
Re: 5S - Second engine rebuild required already!!!
Sounds brilliant!
What be the most central track for the three of us? I'm right in the middle of Glasgow and Edinburgh, Scotland....
Stephano, have you received your Wilhelm Geo kit yet?
What be the most central track for the three of us? I'm right in the middle of Glasgow and Edinburgh, Scotland....
Stephano, have you received your Wilhelm Geo kit yet?
Re: 5S - Second engine rebuild required already!!!
i dont mind a trip up to Scotland for a holiday/track sesh as long as they dont have sound limits
i dont expect to get my geo kit until late may early june tbh
The way our FANTASTIC customs scum are behaving lately it'll prob be in the uk by now but wont clear for 3+weeks.
i dont expect to get my geo kit until late may early june tbh
The way our FANTASTIC customs scum are behaving lately it'll prob be in the uk by now but wont clear for 3+weeks.
Re: 5S - Second engine rebuild required already!!!
A trip to Scotland would be good, or maybe Anglesea- I love that track...not sure when I'll have my car ready though...maybe late summer
-
- Posts: 4789
- Joined: Thu Nov 24, 2011 1:01 pm
- Contact:
Re: 5S - Second engine rebuild required already!!!
Meet in the middle at Donington Park
Re: 5S - Second engine rebuild required already!!!
One slight problem...Donnington are strict on noise limits
...but otherwise that would be great
...but otherwise that would be great
Re: 5S - Second engine rebuild required already!!!
well im around 105db @ 4500rpm
and thats off boost
and thats off boost
Re: 5S - Second engine rebuild required already!!!
It's your side exit screamer that'll get you black flagged mate
Re: 5S - Second engine rebuild required already!!!
Knockhill has no limit. Certainly on open pit sessions....
-
- Posts: 3781
- Joined: Fri May 28, 2010 12:04 pm
- Location: London, Edinburgh, or the Highlands!
Re: 5S - Second engine rebuild required already!!!
J-1 wrote:Knockhill has no limit. Certainly on open pit sessions....
How do you find their open pit sessions?? I have never been on one (driven their Ferrari once, but never my own car ) but I have heard a lot of mixed reviews bellends in cheapo cars that don't care much for your bumper etc.