YVS Performance 5SGTE
Moderators: IMOC Moderators, IMOC Committee Members
Re: 5S - Second engine rebuild required already!!!
Made me one a nur spec exhaust again, how loud is it?
Re: 5S - Second engine rebuild required already!!!
I had only read page 1 sorry didn't realise how many pages there was
Re: 5S - Second engine rebuild required already!!!
I had only read page 1 sorry didn't realise how many pages there was
Re: 5S - Second engine rebuild required already!!!
Made me one a nur spec exhaust again, how loud is it?
Re: 5S - Second engine rebuild required already!!!
Nur Spec was quite loud. You'll hear it on the video below.
Not the best quality but hopefully give you an idea.
https://youtu.be/N-FHgE7az8w
(Full road trim with standard brakes).
Not the best quality but hopefully give you an idea.
https://youtu.be/N-FHgE7az8w
(Full road trim with standard brakes).
Re: 5S - Second engine rebuild required already!!!
Sounds really good
Re: 5S - Second engine rebuild required already!!!
Not a great deal to report. Fuel system is being finished this week, and then it's away next week to have an exhaust and intercooler pipework fabricated. It'll be back to Peters after that for the last few odd jobs before turning the key.
Re: 5S - Second engine rebuild required already!!!
For anyone still interested, exhaust and BMIC pipework done.
Back to Peters for a couple of weeks to get the final bits finished.
Back to Peters for a couple of weeks to get the final bits finished.
Re: 5S - Second engine rebuild required already!!!
Getting there mate!
Exhaust looks tidy.
Exhaust looks tidy.
-
- Posts: 4789
- Joined: Thu Nov 24, 2011 1:01 pm
Re: 5S - Second engine rebuild required already!!!
Those welds!
Re: 5S - Second engine rebuild required already!!!
What the hell?! It's actually starting to look like it might run!
Re: 5S - Second engine rebuild required already!!!
That exhaust looks lickable
FORGED BUILD (424hp @ hubs): http://www.imoc.co.uk/forums/viewtopic.php?t=170916
Re: 5S - Second engine rebuild required already!!!
That's the current state of play at the moment.
The exhaust guy took a lot longer than first quoted, which meant it knocked my schedule with Peter. It was agreed that I'd pick it up 22nd May which would have given Peter 2 weeks to finish fuel system, some wiring and a few other bits and bobs. However, Peter still hasn't got the car back but should hopefully have it back over the next day or so, and then I guess I'll just have to wait and see how he gets on.
The exhaust guy took a lot longer than first quoted, which meant it knocked my schedule with Peter. It was agreed that I'd pick it up 22nd May which would have given Peter 2 weeks to finish fuel system, some wiring and a few other bits and bobs. However, Peter still hasn't got the car back but should hopefully have it back over the next day or so, and then I guess I'll just have to wait and see how he gets on.
Re: 5S - Second engine rebuild required already!!!
ashley wrote:What the hell?! It's actually starting to look like it might run!
I hope so mate as I'm dying to get out in it over the summer but xxxx knows. Losing the will to live with it the now if I'm honest.
There's days I love it and actually get excited about it, and then there's days I could soak it in petrol and throw a match at it...
Re: 5S - Second engine rebuild required already!!!
And thanks to everyone else for the comments.
The pipework does look superb!
The pipework does look superb!